Our fees depend on unit count, travel distance from Cheongju, and whether you need a one-time review or ongoing stability monitoring. All figures below are starting points — final quotes follow a brief scope conversation.
Equipment Review & Bench Testing
Single-unit bench report: from ₩180,000
Includes intake of one air-cooled miner (0.05 TH/s minimum rated capacity), 24-hour burn-in, hash rate verification at documented wall draw, fan noise measurement, and a written report with thermal photographs.
Multi-unit batch (3–10 units): from ₩450,000
Per-batch pricing covers sequential benching, comparison tables, and a summary letter noting units that deviate more than three percent from manufacturer spec.
Purchase advisory call (45 minutes): ₩90,000
For operators still selecting hardware. We review your room dimensions, electrical panel capacity, and noise constraints, then recommend air-cooled models that fit — without selling you equipment.
On-Site Installation & Commissioning
Half-day commissioning (up to 4 units): from ₩320,000
Travel within 50 km of Cheongju included. Covers rack or shelf mounting, dedicated circuit verification, initial firmware baseline, and a four-hour stability watch.
Full-day commissioning (5–12 units): from ₩580,000
Adds ducting recommendations, filter schedule, cable labeling, and a handover document for your electrician.
Travel beyond 50 km: ₩1,200 per km round-trip
Applies to sites in other provinces. Overnight stays quoted separately when required.
Maintenance & Stability Support
Monthly stability check (remote + quarterly visit): from ₩220,000/month
Covers log review, firmware update advisories, and one on-site fan or thermal inspection per quarter for up to eight units.
Emergency same-day visit: from ₩150,000 plus travel
For active contract clients experiencing sudden hash drop or thermal shutdown. Non-contract clients quoted at standard day rates.
What Affects Your Quote
- Total rated hash rate and number of physical units
- Whether your space is conditioned, passively vented, or requires new ductwork
- Electrical panel age and available breaker slots
- Need for landlord or insurer documentation
- Timeline — rush commissioning within 48 hours carries a twenty percent surcharge
Deposits & Payment
Installation bookings require a thirty percent deposit to hold the schedule. Bench testing is invoiced on intake. We accept bank transfer; we do not process card payments on this site.